Rehabilitation Space 29 April 2016

The Decree on Technical Inspection of Buildings with an Age of More Than 45 Years

On May 27, 2015, Decree 67/2015 came into force to promote the duty of conservation, maintenance and rehabilitation of residential buildings through technical inspections and the building book. The decree prescribes a mandatory review that must pass all multi-family and single-family housing buildings that are over 45 years old, and those that are reaching this age. The aim is to institute a system of periodic monitoring of the condition of residential buildings, putting into practice a procedure to verify the duty that owners have to conserve and rehabilitate their properties.

For this, a competent technician will visually inspect the condition of the constructive elements that make up the building and facilities so that the communities can establish a repair project and, if necessary, achieve the necessary fitness conditions.


Relationship of the age of the building with the maximum period to pass the inspection

— Prior to 1950 they must have already carried out the inspection
— Between 1951 and 1960 Until December 31, 2015 (This is the case of Folgueroles, 15)
— Between 1961 and 1970 Until December 31, 2016
— From 1971 Until 31 December of the year in which the building reaches 45 years of age

For single-family dwellings, exempt if the construction is separated by 1.5 m or more from the public road, from areas of public use and from adjacent properties, and if they currently have a certificate of occupancy in force until it expires:

— Previous to 1900 Until December 31, 2016
— Between 1901 and 1930 Until December 31, 2017
— Between 1931 and 1950 Until December 31, 2018
— Between 1951 and 1960 Until December 31, 2019
— Between 1961 and 1975 Until December 31, 2020
— From 1975 Until 31 December of the year in which the building reaches 45 years of age


Important differences with the new decree

On the one hand, single-family homes facing the street or neighbors must carry out the ITE. In addition, the fact of not having the report may lead to the imposition of coercive fines according to Law 18/2007.

There are four classifications of pathologies: very serious, serious, major and mild, which will result in the suitability or not of buildings.

On the one hand, the building will be suitable if it does not have deficiencies or those that it presents are slight, with a validity of 10 years.

The building will be provisionally fit if it has deficiencies classified as significant. Validity of 6 years but it is necessary for the technician to review the important pathologies every two years to verify that the pathologies have not worsened. In the event that they are repaired, it will no longer be necessary to review and the report will have to be made again when the period of 6 years

is exhausted.

The building will be suitable for precaution if it has deficiencies classified as serious or very serious, if precautionary measures have been taken and there is no risk to people. Validity of 3 years but it is necessary for the technician to review serious or very serious pathologies every twelve months or less to check that the pathologies have not worsened. In the event that they are repaired, it will no longer be necessary to review each month and the report will have to be made again as soon as the 3-year period is exhausted.

Resolution denying fitness if the building presents serious or very serious pathologies without the mandatory precautionary measures executed. And a new ITE will have to be presented once it is accredited that they have been carried out.

The technician will provide the ITE to the Property and it will have a maximum period of 4 months to communicate and facilitate this ITE to the Generalitat. After this period, the ITE carried out will not be valid.

For the ITEs carried out so far with the previous decree not presented to the Generalitat, it will be necessary to request the certificate of aptitude within a maximum period of 6 months after the entry into force of the new decree, that is, at the latest on 27/11/2015, otherwise the ITE carried out will not be valid. And the buildings that the ITE presents with serious or very serious pathologies have time to carry them out until 27/5/2017, once this period has expired without having carried out the repair works of serious or very serious pathologies, the ITE will be without effect and a new ITE will have to be carried out according to the regulations in force

at that time.